What communities have asked for
Updated 2026-08-07
National polling shows Americans who oppose local data centers lead with material stakes: water, energy and the grid, utility bills, land, and noise — not abstract AI arguments.
COFAIR's checklist maps those concerns into seven enforceable asks: water disclosure; grid safety and curtailment; a separate rate class so upgrades are not socialized; transparent siting without NDAs on critical impacts; location-based emissions reporting; additional clean supply; and local jobs & procurement — hire/wage standards tied to a verifiable share of contract value for local vendors.
If a developer claims local economic benefit, put numbers in the development agreement or PILOT — with clawback if the floor is missed. Do not treat jobs promises and contracting floors as separate politics; they are one labor ask with two instruments.
Sources
- Why Americans Oppose Data Centers in Their Own Backyard — Gallup (panel of U.S. adults) (2026-04). 71% oppose data centers in their area; unprompted themes prioritize resources, QoL, and costs.
- Community subdomain copy rationale — COFAIR (2026-07)